Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...


If you are given a list of tests to run by some other system (e.g., the IHE Gazelle software for pre-Connectathon or Connectathon testing), then you should execute the tests in that list.

Submitting Test Results into Gazelle

The RFD Testing System does not produce a result file that can be loaded into Gazelle. The web based user interface does provide evaluation and reporting of your transactions. 

Make a screen capture of the web user interface that shows the result of your test and upload that into Gazelle as evidence that you have completed the specific test successfully.

Installation and Configuration

...